Work done by rajan in 1 day = x = 1/24
Work done by amit in 1 day = y = 1/30
So, work done by both of them in 1 day = x+y = 54/120 = 3/40
Total work done in x days by both of them = 1.
Thus, (x)(3/40)=1 i.e. x=40/3 =13.3333
So, if both of them work together it will take 13.3333 days for them to complete work.
1 5 1
2014-01-24T10:00:24+05:30
Work done in 1 hour by rajan =1/x
work done in 1 hour by amit =1/y
so total work will be
1/x+1/y 
1/24+1/30